Skip to ContentSkip to Navigation
About us Latest news News News articles

Road closure on part of Oude Boteringestraat on Monday 13 March

Dismantling tower crane Rölinggebouw
08 March 2023

On Monday 13 March 2023, the tower crane of the Rölinggebouw will be dismantled. During this dismantling work, a safety zone will be cordoned off so that part of Oude Boteringestraat (see map) will be closed between 6 a.m. and 6 p.m..

A detour via Poststraat will remain accessible. The contractor will deploy traffic controllers to direct traffic. Stores and homes will remain accessible. In the map below, the green zone is available to traffic. The orange zone is closed for dismantling work.

Detour route during road closure Oude Boteringestraat
Detour routes for dismantling tower crane on 13 March.
Green = accessible zone. Orange = restricted zone

If you have any questions and/or complaints, please email to: frg@visserensmitbouw.nl

Last modified:08 March 2023 09.18 a.m.
View this page in: Nederlands

More news

  • 10 June 2024

    Swarming around a skyscraper

    Every two weeks, UG Makers puts the spotlight on a researcher who has created something tangible, ranging from homemade measuring equipment for academic research to small or larger products that can change our daily lives. That is how UG...

  • 24 May 2024

    Lustrum 410 in pictures

    Lustrum 410 in pictures: A photo report of the lustrum 2024

  • 21 May 2024

    Results of 2024 University elections

    The votes have been counted and the results of the University elections are in!