Construction started in September 2020. First, foundation piles are placed. To reduce vibration and noise nuisances, the pile foundations will be constructed by boring holes into the ground rather than piling the ground. The data centre is expected to be in use early 2022.
Team
The contract was awarded based on a UAV-GC contract. The building team consists of:
- ENGIE
- Bouwgroep Dijkstra Draisma
- advisor Zentrys
- Dijkhuis ingenieurs
- Team4architecten
In addition, installation technical advisor Deerns assists the university during the tendering, design and implementation phase.