Skip to ContentSkip to Navigation
Groundbreaking Work
@University of Groningen
Groundbreaking Work Projects Aletta Jacobshal

Pond around Aletta Jacobshal is being excavated again

28 May 2020

The temporary construction site around the Aletta Jacobshal on the Zernike Campus Groningen will be excavated again in the coming period. The pond is expected to be repaired at the beginning of July 2020.

The Aletta Jacobshal was completed by BAM Bouw en Techniek at the beginning of May 2020. In the coming months, the building will be equipped and made suitable for education and examination starting in the coming academic year.

The soil along the facade will be excavated, so that the pond returns
The soil along the facade will be excavated, so that the pond returns
Last modified:28 May 2020 2.05 p.m.
View this page in: Nederlands

More news

  • 10 June 2024

    Swarming around a skyscraper

    Every two weeks, UG Makers puts the spotlight on a researcher who has created something tangible, ranging from homemade measuring equipment for academic research to small or larger products that can change our daily lives. That is how UG...

  • 24 May 2024

    Lustrum 410 in pictures

    Lustrum 410 in pictures: A photo report of the lustrum 2024

  • 21 May 2024

    Results of 2024 University elections

    The votes have been counted and the results of the University elections are in!

Follow us onfacebook instagram